Competitive Advantage:
1). 18 Months Guarantee for quality.
2).OEM manufacturer, print client’s LOGO on the valve body.
3).Offer Operation Manual & Install Introduction for safety use.
4).Offer manufacturer’s reasonable price to win the market for both.
5).Accept any the third party inspection.
6).As a factory, every production process can be controlled during manufacture.
7).Offer inspection & testing reports for raw materials, production process, wall thickness, face to face dimension, pressure test, welding test, painting test, etc.
Y spring check valve thread socket weld end
Y type check valve is installed on integrated control water pipe. as a safety device to automatically prevent the counter current of the medium. The first is a bolted bonnet. The valve body is connected with the bonnet with a bolt nut and a wound gasket (31) 6 clip flexible graphite manufacture) seal, may also use the metal ring connection. The second design form is welded bonnet.
Features:
1/4"~3" (DN6~DN80)
W.P.:800WOG (PN50)
W.T.: -20℃-180℃
Investment casting
Thread end: ASME B 1.20.1(NPT)
DIN 259/DIN 2999,BS 21,
ISO 288-1,ISO 7-1
Socket weld end: ASME B16.11
Material List |
||||
No. |
PARTS |
MATERIAL |
||
1 |
BODY |
WCB |
CF8 |
CF8M |
2 | NUT | 304 | 304 | 316 |
3 |
WASHER | 304 | 304 | 316 |
4 | SEAT |
PTFE |
||
5 |
DISC | CF8 | CF8 | CF8M |
6 | SPRING | 304 | 304 | 316 |
7 | GASKET |
|
||
8 | BONNET |
|
|
|
Category: Y type strainer
Unit:mm
Dimensions |
||||||
SIZE |
d |
L |
H |
D |
J |
|
1/4" |
DN6 |
12 | 60 | 41 | 14.2 | 9.5 |
3/8" |
DN10 |
12 | 60 | 41 | 17.6 | 9.5 |
1/2" |
DN15 |
15 | 60 | 41 | 21.8 | 9.5 |
3/4" |
DN20 |
20 | 75 | 52 | 27.2 | 12.5 |
1" |
DN25 |
24 | 85 | 60 | 33.9 | 12.5 |
1--1/4" |
DN32 |
32 | 104 | 79 | 42.7 | 12.5 |
1-1/2" |
DN40 |
39 | 108 | 82 | 48.8 | 12.5 |
2" |
DN50 |
50 | 126 | 94 | 61.2 | 16 |
2-1/2" |
DN65 |
63 | 165 | 106 | 73.9 | 16 |
3" |
DN80 |
76 | 192 | 120 | 89.8 | 16 |
Y spring check valve thread end
Packing & Delivery :
Packing Details : all by seaworthy plywood case and packed strongly by packing belt as below
Delivery Details : Generally it is 5-10 days if the goods are in stock. or15-30 days if the goods are OEM or not enough subject to the order quantity. But anyway, normally, we are able to make sure the delivery will not exceed 45days.