Description:
Wellhead gas recovery project, that is, wellhead gas treatment and recovery to produce CNG, liquefied gas and stable light hydrocarbons, the design scale is 5-10MMSCFD. The factory includes process equipment and supporting auxiliary engineering and public engineering equipment. The designed annual operating time of the device is 8000 hours, and the operating flexibility is 60% to 120%.
Features:
All equipment of the natural gas recovery plant is designed according to skid-mounted, intelligent, integrated and modular design. The entire station has a high level of installation and commissioning, equipment safety and reliability, system operation stability, user-friendly operation interface, and wide range of applicable working conditions.
Technical parameters:
We have the manufacturing capability of complete sets of natural gas and natural gasoline recovery device with the capacity of 10,000-220,000m3/day.
We own the capability and rich practical experience of process design capability, linkage trial run and training service.
Configurations:
◆ MAIN PROCESS FACILITY
★ Pressure regulator at well site ★Pre-separation unit at plant inlet ★Feed gas booster ★CNG compressor ★ Molecular sieve dryer ★Propane refrigerator ★Fractionation unit
◆AUXILIARY FACILITY
★CNG storage and transportation unit ★LPG storage and transportation unit ★Natural gasoline storage and transportation unit ★Waste heat recovery system ★Gas generator set
◆PUBLIC FACILITY
★Instrument air system ★ Softener water system ★ Fire pump skid ★ Power distribution system ★ Control system