Hot-dip Galvanized solar energy panel bracket ground mount PV structure
Product Name | Solar Energy Bracket Ground Mount PV Structure YRK-Ground03 |
Brand Name | YRK |
Max Wind Load | 60M/S |
Max Snow Load | 1.5KN/㎡ |
Material | Aluminum 6005-T5+ SUS304 |
Certificate | ASNZS1170/Gamcorp/MCS/Intertek/SPAD |
Surface Treatment | Oxygen white light |
Color | Silver |
Features:
a.High adaptability to different terrain and environment.
b.High preinstallation and rapid installation.
c.No need to weld at the project site.
d.No need to level the land.
e.Save construction costs.
f.Suitable for ground installation,the foundation is cement pier or ground pile.
Q: How long is your delivery time?
A: Generally, for LCL goods is 7-15 working days, FCL can be 20-35 working days. For more, it should be negotiated.