Prefabricated tiny living kit homes

Sales Prefabricated tiny living kit homes

Easy assembly prefab house economical portable tiny home
  • Price : 135-165 usd/sqm

Product Detail  

Prefabricated tiny living kit homes 

Product overview

Structure: the light steel structure is the skeleton, and the composite board is the maintenance material
Main purpose:  Apartments, offices, shopping malls, churches, hotels, dormitories, etc.
Steel structure frame, strong and durable
All components are prefabricated in the factory, and the construction period is short
Energy saving and environmental protection, economical and practical.


Product advantage

1.Easy to assemble and disassemble with simple and common tools;
2.Good waterproof performance and heat-insulation;
3.Good fireproof performance with rockwool sandwich panel;
4.Could stand firmly over 30 years;
5.Various designs available, customized designs acceptable;
6.Beautiful appearance, virious colors and shapes for outer and inner roof panel and wall panel;

7.Wide range of application, could be used as offices, residential, sentry boxes, dormitories, shops,kiosks and so on.

Prefabricated tiny living kit homes

Product installation

Prefabricated tiny living kit homes


Company profile

Hebei Baofeng Steel Structure Co., Ltd. is located in Cangzhou City, Hebei Province, 150 kilometers away from Tianjin Port, convenient for transportation.Our conmpany is a professional steel structure and prefab house manufacturer with 16 years of production experience; it has scientific and advanced technical support and a number of perfect standardized production lines; professional and experienced designers, we will provide you free of charge according to your requirements. 
Hebei Baofeng Steel Structure Co., Ltd.


FAQ

1. How Long does it take to build a prefab container house?
A: It depends on the size of the house. Generally, the construction period is around 3 days of a house by a construction team with 3-5 people. And just one day is enough to build the steel structure frame.

2. Would you send engineers to the site to guide for working when installed?
A:Yes, usually we will send one experienced engineers to the site.

3. How Long does it take to produce the hosue?
A: About 20-30 days accordingly. 

4. What kind of things you would offer for prefab house?
A: Usually, we offer all house building need material. Besides, we can offer the bathroom (Toilet, washbasin, showeroom) and kitchen room (Cabinet, vegetable sink),and if you need other furnitures, we can help purchase too.

5. Does this kind of house can only be used in residential building?
A: Absolutely not. it can be used as hotel, office, school, aeprtment, shelter, ect.

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
X

Home

Supplier

Leave a message

Leave a message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.