Multi-layer steel structural stadium building steel materials construction

Sales Multi-layer steel structural stadium building steel materials construction

high rise prefabricated building steel structural
  • Price : 30-50 usd/sqm

Product Detail  

Product specifications

Steel structure building is made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.

Product name Multi-layer steel structural stadium building steel materials construction 
Column and beam H beam steel 
Purlin
C/Z section steel
Wall & roof materila 50/75/100/150mm EPS/PU/rockwool/fiberglass sandwich panel
Connect
Bolt connect
Window PVC or aluminum alloy
Door electrical shutter door/sandwich panel door 
Certification
ISO9001/CE


More applications

There are a wealth of applications of the steel structures buildings in sports industry, such as table tennis court, basketball stadiums, indoor badminton court, football stadium, sports gym, and so on. The construction speed is very fast, once completed, it can be put into use, which saves manpower and time cost.





Installation 

1.To provide product installation drawings and video, if you have special requirements, we also have engineers to guide the installation.
It is very easy to assemble and disassemble, you can install the house just like playing the Block Game. One worker can assemble 40-50 square meters in 8 hours, also you can build the house just follow our video. 
2. if have any problems, we will promptly give a reasonable solution 24 hours.


Multi-layer steel structural stadium building steel materials construction


Packing and loading

1.The primary and secondary steel are packaged as a whole;
2.The accompanying items are packed in boxes;
3.The roof, wall panels and accessories are packed in bulk;
4.Each part of all items is printed with an independent number, which is convenient for customers to install and use;
5.Adopt the most reasonable packing scheme to ensure the maximum use of the container's space load;


Multi-layer steel structural stadium building steel materials construction


FAQ

Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.

Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.

Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.

Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.

Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.

Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
X

Home

Supplier

Leave a message

Leave a message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.