Description:
Gas filling function: the LNG in the storage tank is pumped out and pressurized by the LNG cryogenic pump, and then the car is filled with liquid through the filling machine
Unloading function: the cryogenic pump pumps the LNG from the LNG tanker to the LNG storage tank
Pressurization function: Inject part of the LNG in the storage tank into the vaporizer to vaporize into BOG (Boil Off Gas) into the storage tank, and stop when the storage tank pressure reaches the set pressure
Temperature adjustment function: Use LNG cryogenic pump to pump out part of LNG from the storage tank and inject it into the temperature increaser and then enter the storage tank, and stop when the liquid temperature reaches the set temperature.
Generally pure LNG refueling station consists of: LNG storage tank, pump skid and submersible pump, storage tank booster vaporizer, unloading vaporizer, EAG heater (different process flow, these three vaporizers will also have corresponding changes), liquid filling Machine and other components.
Features:
* High safety coefficient: Core components are international and
domestic famous brands.
* Fast unloading: 20 tons of LNG trailer, unloading time is not
exceed 2.5 hours;
* High degree of automation – unattended operation, except for
unloading;
* Long service time: Trouble-free operation time is more than
10000 hours
Technical Parameters:
No. | Name | Number | Type | Application | Key Equipment | Station Capacity |
1 | LNG Fueling Station | EPC0702001 |
LNG
Station Solution |
heavy trucks,city bus,coach, |
Cryogenic
submersible pump,Low
temperature storage tank,LNG
Dispenser,Double pump
skid,Station BOG
recycling skid |
30-120m³ |
2 | L-CNG filling station | EPC0702002 |
L-CNG
Station Solution |
heavy trucks,city bus,coach,Private Fleet Station/Pubilc Retail Station serving sedans,pickups,taxi,trucks,light/medium duty vehiles |
L-CNG
plunger pump skid,L-CNG high-pressure gasification skid,Cryogenic submersible
pump,Low temperature storage
tank,LNG Dispenser,CNG
dispenser |
10-20mmscfd |
3 | LNG gasification station | EPC0702003 |
LNG
gasification station solution |
heavy trucks,city bus,coach, |
LNG dump truck skid,Storage tank pressurized skid,Measuring pressure regulating skid,air type vaporizer,water bath type vaporizer |
30-120m³ |
4 | LNG receiving station | EPC0702004 |
LNG
receiving station Solution |
Unloading arm, storage tank, low-pressure transfer pump, high-pressure transfer pump, vaporizer, BOG compressor, flare tower |
Operating process:
Applications:
LNG filling for heavy trucks,city bus,coach,