Best Price 100kw High-power On-grid Solar Energy System
Product Description
Advantages of on-grid solar system
Technical Details
100kw On-grid Solar Power System Components List |
|||
Item | Model | Description | Quantity |
1 | Solar Panel |
Mono 390w solar panel(adjustable ) |
256pcs |
2 |
AC Distribution Box |
100kw,230v(can be customized ) |
1pc |
3 | On-grid Inverter | 50kw | 2pc |
4 | Mounting Support | Roof/Ground | 1set |
5 | PV Cable | 4mm² PV cable | 600m(can be customized ) |
6 | Connector | Solar connector | 30 pairs |
7 |
Wi-Fi Module |
Monitoring device |
1pc |
|
>Perc/Bifacial/Shingled solar panels are available. >25-year linear warranty. >High transmissivity,low-iron tempered glass. >Class A,tested in TUV. >Highest conversion efficiency of 22% >Excellent mechanical load resistence
>PID Resistant, High salt and ammonia resistence
|
>230V AC voltage. >20kw Power. |
|
|
>The core technologies are from Germany.
>Support rs485,GPRS,WIFI,GPRS200. >Wider voltage range, lower starting voltage and higher conversion efficiency (Max efficiency can reach to 98.2%)
>Small in size, light in weight, easy to install.
|
|
>PV Cable 4mm ² 6mm ². >AC Cable. >Length can be customized. |
>Tile Roof /Metal Roof/RC Roof is available. >Solar Carport Solution >Vetical wall solar mounting system >Car parking solar mounting system
|
|
Packing&Delivery
Factory
|
|
|
|
Certicification
FAQ
1. What about the quality of the mounting support? 2.Can the excess electricity be sold to the state grid in grid-tied solar system? A:Right.Excess electricity will get additional benefits. When electricity is insufficient, it will also be replenished through the state grid.The state grid is equivalent to a free power transfer station. 3.Are your grid-tied certifications complete? A:Sure,We have exported on-grid systems to more than 30 countries, covering Europe, America, Asia, Africa and Australia. The certification is very complete .
4. What if the power generation system shows abnormal power output? A: 1. whether the module is over-matched 2. whether the module is shaded 3. whether the module is abnormal 4. whether the module orientation and inverter working mode 5. whether the grid connection distance is appropriate. 5.How do your company deal with the problem on quality? A:Our company has been doing this industry for more than 10 years. It has already had a certain reputation. We will carefully analyze it. If it is indeed our quality problem, you can rest assured that it will do things according to the contract agreement and will never let you have any after the worries, our service team will be happy to serve you. |