20F11NC072JA0NNNNN, New And Original Rockwell Ab Module PLC, in stock and ready to ship!
Place of Origin | America |
Brand Name | Allen-Bradley |
Model Number | 20F11NC072JA0NNNNN |
Product name | CPU Module |
Application | INDUSTRIAL AUTOMATION |
Warranty | 1 Year |
Shipping term | TNT DHL FEDEX EMS UPS |
Delivery time | 1-3 Days |
PowerFlex 753 AC Drive, with Embedded I/O, Standard Protection, Forced Air, AC Input with DC Terminals, Open Type, 72 Amps, 37kW ND, 30kW HD, 400 VAC, 3 PH, Frame 4, Filtered, CM jumper installed (preferred), DB Transistor, Blank (No HIM) | |
The PowerFlex 750-Series is a robust family of AC drives that provide ease of use, flexibility, and performance for various industrial applications. |
|
PowerFlex 753 drives provide general-purpose control for applications up to 400 Hp and 270 kW. PowerFlex 755 drives provide maximum flexibility and performance up to 2000 Hp and 1500 kW. |
1756-IF8H | 1756-OV16E | 1756-IT6I2 | 1756-EN2T | 1756-IC16 |
Company Profile
Guangzhou Heneng trade companythe main products are automation controlelectronic components, touch screen and other electronic products. With nearly 10 years industry experience ofelectronic component and professional services, Heneng trade company has won the trust of customers. Heneng's believe is help our customer factories to become automation and to create the greatest benefit for clients.
Heneng is looking forward to cooperate with you!
FAQ
1. Q: How to guarantee the quality of your products ?
A: All goods are new and original with 365 days guarantee. .
2. Q: Could Heneng Trade provide Technology Support?
A: We're in this field many year. If there's any problem, please contact us,we'll provide suggestion
from our engineerand the Manufacturer to help you solve the problem.
3. Q: What warranty does Heneng Trade Provide ?
A: All parts we sell have 30 days return policy from the day of shipment, but if Damage
we are unable to replace it.
4. Q: What shipment Service Heneng Trade Provide?
A. We Ship via DHL, Araemx, FEDEX, UPS, EMS express, depends on customer's requirement.
5. Q: What is your shipment procedure after getting the payment?
A. We dispatch the goods within 1 day after getting the payment, Air shipping usually take
3-5working days to reach there ondestination place, we will provide the tracking number to
you when we dispatch goods.