Competitive Advantage:
1. 18 Months Guarantee for quality.
2.OEM manufacturer, print client’s LOGO on the valve body.
3.Offer Operation Manual & Install Introduction for safety use.
4.Offer manufacturer’s reasonable price to win the market for both.
5.Accept any the third party inspection.
6.As a factory, every production process can be controlled during manufacture.
7.Offer inspection & testing reports for raw materials, production process, wall thickness, face to face dimension, pressure test, welding test, painting test, etc.
2-PC Vertical check valve thread end:
Features:
1.1/4"~2" (DN6~DN50)
2.W.P.:1000WOG (PN63)
3.W.T.: -20℃~425℃
4.Investment casting
5.Thread end: ASME B1.20.1(NPT)
DIN 259/DIN 2999,BS 21,
ISO 288-1,ISO 7-1
Material List |
||||
No. |
PARTS |
MATERIAL | ||
1 | BODY |
WCB |
CF8 |
CF8M |
2 | DISC | CF8 | CF8 | CF8M |
3 | SPRING | 304 | 304 | 316 |
4 | GASKET |
PTFE |
||
5 | BONNET | WCB | CF8 | CF8M |
Unit:mm
Main Parts and Materials |
||||
SIZE |
d |
L |
D |
|
1/4" |
DN6 |
10 | 52 | 32 |
3/8" |
DN10 |
12 | 52 | 32 |
1/2" |
DN15 |
14 | 60 | 35 |
3/4" |
DN20 |
19 | 69 | 40 |
1" |
DN25 |
24 | 80 | 46.5 |
1-1/4" |
DN32 |
31 | 87 | 56 |
1-1/2" |
DN40 |
38 | 100 | 67 |
2" |
DN50 |
49 | 119 | 80.5 |
Features:
1.1/2"~2" (DN15~DN50)
2.W.P.: 1000WOG (PN63)3.W.T.: -20℃~425℃
4.Investment casting
5.Thread end: ASME B1.20.1(NPT)
DIN259/DIN 2999, BS 21,
ISO 288-4, ISO 7-1
Material List
|
||||
No. |
PARTS |
MATERIAL |
||
1 | BONNET |
WCB |
CF8 |
CF8M |
2 | GASKET |
PTFE |
||
3 | DISC | CF8 | CF8 | CF8M |
4 | SPRING | 304 | 304 | 316 |
5 | BODY | WCB | CF8 | CF8M |
6 | BOLT |
304 |
||
7 | SPRING WASHER |
304 |
||
8 | NUT |
304 |
||
9 | BONNET | WCB | CF8 | CF8M |
Unit:mm
Dimensions
|
|||
SIZE |
d |
L |
|
1/2" |
DN15 |
14 | 70 |
3/4" |
DN20 | 19 | 77 |
1" | DN25 | 24 | 90 |
1-1/4" | DN32 | 31 | 100 |
1-1/2" | DN40 | 38 | 112 |
2' | DN50 | 49 | 125 |
Packing & Delivery :
Packing Details : all by seaworthy plywood case and packed strongly by packing belt as below
Delivery Details : Generally it is 5-10 days if the goods are in stock. or15-30 days if the goods are OEM or not enough subject to the order quantity. But anyway, normally, we are able to make sure the delivery will not exceed 45days.