Size : 30m x 60m x 8m
Area : 1800sqm
Product specifications
Steel structure buliding is made of the main framework with H beam, C purlin or Z purlin. Roof and wall use variety of panels together with other components such as windows and doors. Steel structure building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time, good effect of insulation, long using life, space efficient, good seismic performance, flexible layout, etc.
Product name |
Multi-layer steel structural stadium building steel materials construction |
Column and beam | H beam steel |
Purlin |
C/Z section steel |
Wall & roof materila |
50/75/100/150mm EPS/PU/rockwool/fiberglass sandwich panel |
Connect |
Bolt connect |
Window |
PVC or aluminum alloy |
Door |
electrical shutter door/sandwich panel door |
Certification |
ISO9001/CE |
Material show
Sandwich panels are mainly used in buildings that require heat preservation and heat insulation. The sandwich panel’s core materials mainly include polyphenylene, polyurethane foam, rock wool, and glass wool.
The roof and wall panels are to ensure a normal and safe production environment in the workshop. It forms a wind load that bears and transmits the wall’s weight through the foundation, wall girt, and wind-resistant columns, and the wind load acts on the wall.
The frame structure system is composed of horizontal and vertical plane frames. As the basic load-bearing structure of the steel structure workshop, the horizontal plane frame is significant. It is composed of a foundation, roof beams, and steel columns.
Installation
1.To provide product installation drawings and video, if you have special requirements, we also have engineers to guide the installation.
It is very easy to assemble and disassemble, you can install the house just like playing the Block Game. One worker can assemble 40-50 square meters in 8 hours, also you can build the house just follow our video.
2. if have any problems, we will promptly give a reasonable solution 24 hours.
FAQ
Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.
Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.
Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.
Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.
Contact us for design
We have professional designers who can provide you with free design solutions according to your requirements. So, if you have any needs, you can contact us at any time.