Agricultural Greenhouse Ground Solar Mounting System

Sales Agricultural Greenhouse Ground Solar Mounting System

Solar ground farm mounting system used in large-scale commercial solar farm power plant for public utility. This is a simple pre-assembled bracket mounting system  which is suitable for frame and frameless modules.

Product Detail  

Agricultural Greenhouse Ground Solar Mounting System

Solar ground agricultural installation system has been developed for installation of photovoltaic array system in open field. The stability and safety of this product conform to international structural mechanics and construction law. Ground mounting systems can be installed in different foundation solutions, such as concrete embedded bolts, direct embedded and ground screws. This product is made of hot-dip galvanized steel and aluminum alloy anodized, with strong anti-corrosion performance, suitable for outdoor agricultural use. The system can be planned and customized in the factory according to the actual needs, avoiding on-site welding and cutting, saving your time and cost.


System Structure


Solar Farm Ground Structure Kits


                                                          

Technical Parameters

 System Name
 Ground Mount System GM13
 Panel Layout
 Landscape or Portrait
 Foundation
 Concrete Foundation,Ground Screw
 Material
 Anodized AL6005-T5
 Tilt Angle
 0-30degrees    
 Fastener
 SUS304 &Zinc-Nickel Alloy Electroplated Steel
 Snow Load
 1.6KNhttps://www.jesferindustry.com/㎡   
 Color
 Customized or Silver
 Wind Load  80mhttps://www.jesferindustry.com/s  Design Standard
 ANhttps://www.jesferindustry.com/NZS1170,DIN1055,JIS C8955,etc.
 Applicable Solar Module
 Framed or Frameless
 Warranty
 10 Years  
 Ground Clearance  above 1800mm  Small Components  Anodized AL-6005-T5


Components Details

Solar Mounting HardwareSplice for Cross Beam kit 

Specification:L260mm

Components:Splice for Cross Beam,Hexa Self-Tapping Screw

with EPDM Washer ST6.3*19


Solar HardwareCross Beam

Specification:L*71*85

Standard Length:3100mm,4100mm,5100mm

Solar Screen Mounting Hardware 

Pre-Assemble Support

Components:55*55Tube;U-shape Connector ,T-shape Connector

;55**55C Clamp kit Corrugated gasket;Flat washer M8,

Spring washer M8; Flat washerM12 ,Hexagon Socket Head Bolt M8*20,

Flat washer M12;Spring washer M12,Hexagon Socket Head Bolt M12*95,

Hexagon Socket Head Nuts,Hexagon Socket Head Bolt M12*90

Solar Hardware Products Post

Specification:L150

Components:55*55Tube,U-shape Connector,

U-shape Single Connector,T-shape kit,Flat washer M12

Spring washer M12,Hexagon Socket Head Bolt M12*90

Spring washer M8,Hexagon Socket Head Bolt M8*20

Solar Screen Mounting Hardware Wide End ClampKit

Components:Wide End Clamp, Cross Module,

Spring Washer M8,Hexagon Socket Bolt

Solar Panel Mounting Hardware Inter Clamp Kit

Components:Inter Clamp,Cross Module

Spring Washer M8,Hexagon Socket Bolt

Solar Roof Mounting HardwareC Clamp Kit

Components:C Clamp, Cross Module,Spring Washer M8

Hexagon Socket Bolt

Solar Panel Installation Hardware

Corrugated T Anchor Plate Kit

Components:Corrugated Gasket,Corrugated T Plate

Hexagon Bolt Kit

Material:AL6005-T5(Anodized )

Installation Guide

Commercial Solar Farms Structure Installation Guide



1.Grout the bolt embedded on the concrete foundation based on project solution.

2.Install Anchor Plate.

3.Install Post.

4.Install the Pre-assemble Support.

5.Install Inclined Support.

6.Install Beam.

7.Fix the solar module with Inter Clamp Kit & End Clamp Kit.

8.Installation is done.
Business Terms and Other Details of Jesfer Solar:

1).Delivery Terms:FOB, CNF, CIF,EXW are available.

For some countries, we can cooperate with DDP, such as Philippines, Malaysia, Thailand, Vietnam, Botswana and so on.

2).Terms of payment:Deposit before production by Thttps://www.jesferindustry.com/T, The balance shall be paid after inspection and before shipment.

3).Production time:Sample order normally take about 3-7days .and bulk orders usually take about 20-30 days.

4).Time of shipment:

For Southeast Asia:10-15days.

For Europe:around 30days

For Africa:around 20-30 days

For the Middle East :around 20-30 days

For South American countries:around 40-50 days

Production and transportation of Solar Plant Farm Components

1).Production:We have a lot of production equipment, for large orders, we can complete production faster than many competitors.

2).Transportation:Our city has international seaport by Xiamen and international airport  by Gaoqi, goods can be easily transported to all parts of the world.

Excellent quality made us more competitive in the markets, we are always looking for good partners for long cooperation, if you are interested in High Quality & Free Design For Concrete Foundation Ground Mounting Brackets, pls contact us right now.Jesfer! Your Best Choice, Your Reliable Supplier!


Our Packaging

Jesfer packing design engineer team care the safety of workers, both for hand-carrying and forklift processing.The small accessories of Solar Power Farms Ground Mount are packed with 3 standard kinds of paper cartons, weight range from 5-25kg per box, 0.5-1.5tons per pallet. Longer components of Jesfer Commercial Solar Farms Structure like solar railsolar structure beams are loaded on pallets with 2 to 8 pieces per bundle. The sizes of cartons and pallets are always calculated according to 20ft and 40ft containers to ship by sea and by truck inland.Optionally, bulk bundles of longer components like solar rails to be loaded in containers can save some space and logistic freight.

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
X

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.