2 pieces ball valve thread end direct mounting pad
Features:
Full port, 1/4"~4" (DN6~DN100)
W.P.: 1000WOG (PN63)
W.T.:-20℃-180℃
Investment casting
Blow-out proof stem
Live-loading design
Anti-static device (option)
Locking device handle (option)
ISO 5211 Direct mounting pad
Automation accessories(option)
Thread type:ASME B1.20.1(NPT),DIN 259/DIN 2999,BS 21,ISO 288-1,ISO 7-1
Material List |
||||
No. | Parts |
Material |
||
1 | Body | WCB | CF8 | CF8M |
2 | Seat |
PTFE |
||
3 | Ball | CF8 | CF8 | CF8M |
4 | Gasket |
PTFE |
||
5 | Bonnet | WCB | CF8 | CF8M |
6 | Stem | 304 | 304 | 316 |
7 | Stem Washer |
PTFE+25%GF |
||
8 | O-Ring | FPM | ||
9 | Packing |
PTFE |
||
10 | Wear Washer |
PTFE+25%GF |
||
11 | Gland |
304 |
||
12 | Disc Spring |
304 |
||
13 | Gland Flange |
CF8 |
||
14 | Stopper |
304 |
||
15 | Handle |
WCB/CF8 |
||
16 | Bolt |
304 |
||
17 | Nut |
304 |
Dimensions |
||||||||||||
Size |
d | L | H | h | KxK | A | B | Ra | Rb | W | H1 | |
1/4 | DN6 | 10 | 61 | 34 | 9 | 9x9 | 36 | 42 | 3.0 | 3.0 | 140 | 66 |
3/8 | DN10 | 12 | 61 | 34 | 9 | 9x9 | 36 | 42 | 3.0 | 3.0 | 140 | 66 |
1/2 | DN15 | 15 | 61 | 34 | 9 | 9x9 | 36 | 42 | 3.0 | 3.0 | 140 | 66 |
3/4 | DN20 | 20 | 72 | 42 | 9 | 9x9 | 36 | 42 | 3.0 | 3.0 | 140 | 74 |
1 | DN25 | 25 | 78 | 53 | 11 | 11x11 | 42 | 50 | 3.0 | 3.5 | 170 | 88 |
1 1/4 | DN32 | 32 | 95 | 57 | 11 | 11x11 | 42 | 50 | 3.0 | 3.5 | 170 | 92 |
1 1/2 | DN40 | 38 | 106 | 68 | 14 | 14x14 | 50 | 70 | 3.5 | 4.5 | 200 | 106 |
2 | DN50 | 50 | 119 | 78 | 14 | 14x14 | 50 | 70 | 3.5 | 4.5 | 200 | 116 |
2 1/2 | DN65 | 65 | 144 | 104 | 17 | 17x17 | 70 | 102 | 4.5 | 5.5 | 300 | 148 |
3 | DN80 | 80 | 169 | 115 | 17 | 17x17 | 70 | 102 | 4.5 | 5.5 | 300 | 159 |
4 | DN100 | 100 | 205 | 129 | 17 | 17x17 | 70 | 102 | 4.5 | 5.5 | 300 | 173 |
Packing & Delivery :
Packing Details : all by seaworthy plywood case and packed strongly by packing belt as below
Delivery Details : Generally it is 5-10 days if the goods are in stock. or15-30 days if the goods are OEM or not enough subject to the order quantity. But anyway, normally, we are able to make sure the delivery will not exceed 45days.